Sepehr Yasini

PALM VILLA

Project info:

  • Total area: 4000 sq meter
  • Land area: 500 sq meter
  • Construction period time estimation: 2.5 years
  • Units: 2 units in each levels
  • Start date: 2023
  • Location: Sari, Mazandaran
  • Total levels: 11 levels (8 residential, 2 parking lots)
  • Heating system: wall mounted gas boiler and split unit
  • Cooling system: split unit
  • Limits: the structure had been built when the design got started

PROCESS


GROUNDFLOOR PLAN

FIRSTFLOOR PLAN


ELEVATIONS

Want to collaborate on an upcoming project?

Leave your details and Sepehr will get back to you.